7:45am | Registration and Continental Breakfast |
8:15am |
Welcome Session |
Joe Payer, Workshop Chair: Moderator
|
|
9:00am | Plenary Session #1 |
Paul Virmani, FHWA -Research Chemist: Moderator 9:00-9:45 S-K Lee, SK Lee and Associates; Paul Virmani, FHWA ---Bridge Corrosion Issues 9:45-10:30 Bojidar Yanev, NYC DoT ---Owner's Perspective |
|
10:30am | Break |
10:50am | Plenary Session #2 |
Joe Payer: Moderator 10:50-11:45 State DoTs: FL, KY, OH, OR, VA –--State DoT Perspective 11:45-12:00 Kevin Garrity, Mears Group, Inc. ---Corrosion Industry Perspective |
|
12:00pm | Lunch (on your own) |
1:00pm | Plenary Session #3 |
Joe Payer: Moderator |
|
1:45pm | Breakout Session A |
Focus on needs and opportunities in general and by bridge type Plenary Introductions and Room Assignments II-A RC Bridges: Preservation & Life Extension; Inspection, Monitoring, NDE/NDT; Corrosion Mitigation III-A Pre-Stresses Bridges: Preservation & Life Extension; Inspection, Monitoring, NDE/NDT; Corrosion Mitigation IV-A Design and New Construction--Corrosion Mitigation V-A SHM-Full System Models & Corrosion Management Tools |
|
4:00pm | Breakout Session A Briefs |
5:00pm | Adjourn |
5:30pm | Dinner at Cilantro -- 326 South Main St. Akron (optional) |
7:45am | Registration and Continental Breakfast |
8:15am | Plenary Session #4 Joe Payer: Moderator
|
9:00am | Breakout Session B |
Focus on research opportunities, approach and specific projects Plenary Introductions and Room Assignments I-B Steel Bridges: Preservation & Life Extension; Inspection, Monitoring, NDE/NDT; Corrosion Mitigation II-B RC Bridges: Preservation & Life Extension; Inspection, Monitoring, NDE/NDT; Corrosion Mitigation III-B Pre-Stresses Bridges: Preservation & Life Extension; Inspection, Monitoring, NDE/NDT; Corrosion Mitigation IV-B Design and New Construction--Corrosion Mitigation V-B SHM-Full System Models & Corrosion Management Tools VI-B Degradation Process Models |
|
11:15am | Breakout Session B Briefs |
12:00pm | Lunch (on your own) |
1:00pm | Breakout Session C |
Focus on research opportunities, approach and specific projects Plenary Introductions and Room Assignments I-C Preservation & Life Extension II-C Inspection, Monitoring, NDE/NDT--Corrosion Mitigation III-C Corrosion Mitigation-Materials [alloys & inorganic coatings] IV-C Corrosion Mitigation-Cathodic Protection & Electrical Methods V-C Corrosion Mitigation-Coatings, Inhibitors and Additives VI-C Degradation Process Models |
|
3:45pm | Breakout Session C Briefs and Workshop Outcomes and Discussion |
5:00pm | Adjourn |
5:30pm | Dinner at Bricco --1 West Exchange St. Akron (optional) |
7:45am | Continental Breakfast |
8:00am | Working Meeting for Draft Report |
Review all topics and story boards
Major Corrosion Opportunities by Bridge Type
Recommended Research Approaches and Projects
Overview - Discussion of Findings
Writing Assignments
|
|
12:00pm | Adjourn |